The Point Thomson Export Pipeline (PTEP) extends about 22 miles from the Point Thomson Central Pad (CP), located approximately 60 miles east of Prudhoe Bay, to a point of connection with the existing Badami Sales Oil Pipeline at the Badami Central Facilities Pad (CFP). The PTEP lease was issued in 2012, with construction on the pipeline beginning just after. Pipeline construction was completed in 2013, with transportation of product through the line beginning in 2016.
Current Operator
- Point Thomson Export Pipeline, LLC
Regions
Lease Dates
- North Slope
- Original ROW Lease: October 31, 2012 - October 31, 2042
Product
- Crude Oil
Diameter (inches)
- 12.75
System Length/Length on State Lands (approx. miles)
- 22.20 / 22.20
Normal Wall Thickness (inches)
- 0.406
Associated ADL Numbers
- 418975
Positions
- Above Ground
Year Constructed
Related Documents