Milne Point Oil
Milne Point Pipeline originates at Milne Point Central Facilities Pad, passes below Spine Road east of Central Processing Facility One (CPF-1) and terminates at the Kuparuk Pipeline connection near Module 68. The 14-inch diameter pipeline was designed to transport processed crude oil from Milne Point Unit to Kuparuk Pipeline. Milne Point Oil Pipeline was constructed from 1984 to 1985.
Milne Point Oil News
There is no current Milne Point Oil news.
- Active
- Above Ground
- 01/01/1984 - 01/01/1985
- No operators found.
- North Slope
- No leases found.
- No products found.
- 12.00
- System Length: 10.70
- Length on State Lands: 10.70