Badami Utility
The Badami Utility Pipeline begins at the Endicott Causeway, where it connects to the fuel gas line that feeds the Satellite Drilling Island from the Endicott Main Production Island. The 6.625-inch, 31-mile long utility pipeline transports fuel gas and product to the Badami Central Production Facility. The Right-of-Way Lease became effective December 15, 1997.
Badami Utility News
There is no current Badami Utility news.
- Active
- Above Ground
- 01/01/1998 - 01/01/1998
- No operators found.
- No regions found.
- No leases found.
- No products found.
- 6.63
- System Length: 31.00
- Length on State Lands: 31.00