Tyonek W 10 Gas Pipeline

The Tyonek W 10 Gas Pipeline is the newest leg of the Tyonek Transportation System. The seven and a half miles long 10” pipeline originates at the Tyonek Platform and crosses Cook Inlet in a westerly direction to Ladd Landing, terminating at the Kenai Beluga Pipeline connection. The first 5.5 miles of the pipeline are located on State-owned tide and submerged land. Natural gas that is produced on the Kenai Peninsula and at the Tyonek platform will be transported to the west side of Cook Inlet for distribution through this system. The Right-of-Way Lease for the Tyonek W 10 Gas Pipeline became effective April 26, 2018 and is held by Harvest Alaska, LLC, which is a wholly owned subsidiary of Hilcorp Alaska, LLC.


Tyonek W 10 Gas Pipeline News

There is no current Tyonek W 10 Gas Pipeline news.

Current Operator
  • Harvest Alaska, LLC
Regions
  • Southcentral
Original ROW Lease Dates
  • April 26, 2018 - April 25, 2038
Product
  • Natural Gas
Diameter (inches)
  • 10.75
System Length (approx. miles)
  • System Length: 7.50
  • Length on State Lands: 5.50
Normal Wall Thickness (inches)
  • 0.719
Associated ADL Numbers
  • 232962
Positions
  • Subsea
Year Constructed
  • 2018 - 2018