Badami Sales Oil
The Badami Sales Oil Pipeline connects the Badami and Point Thomson fields to the Endicott Pipeline. The 12.75-inch pipeline begins at the Badami Central Production Facility and ends approximately 25 miles to the west at the tie-in with the Endicott Pipeline, where the pig receiver is located. The Right-of-Way Lease became effective December 15, 1997.
Current Operator
Lease Dates
- Savant Alaska LLC
- Original ROW Lease: December 15, 1997 - December 14, 2022
Product
- Crude Oil
Diameter (inches)
- 12.75
System Length/Length on State Lands (approx. miles)
- 25.10 / 25.10
Normal Wall Thickness (inches)
- 0.281
- 0.500
Associated ADL Numbers
- 415472
Positions
- Above Ground
Year Constructed
Related Documents
- 1998