WNS Utility Pipeline

ConocoPhillips Alaska, Inc. (CPAI) applied on June 9, 2023, for a private non-exclusive easement to construct the Western North Slope (WNS) Utility Pipeline (WNSUP). The WNSUP would originate at the Kuparuk Central Processing Facility 2 (CPF2) and end at the planned Willow Central Facility (WCF). The utility pipeline would transport seawater for injection in Willow target reservoirs and provide a future offtake point at a Miscible Injectant/Grind and Inject (MIGI) pad for tie-in to the Alpine Utility seawater pipeline, that is used to transport seawater to the Colville River Unit and Greater Mooses Tooth Unit. CPAI proposes to install the 64 mile 20-inch utility pipeline on new pipeline supports with the proposed WNS Products and Willow Sales Oil Pipelines. Approximately 22.2 miles of the pipeline would cross state lands.

WNS Utility Pipeline News

There is no current WNS Utility Pipeline news.

  • Project
  • Above Ground
  • No construction dates found.
  • No operators found.
  • North Slope
  • No leases found.
  • Seawater
  • 20.00
  • System Length: 63.80
  • Length on State Lands: 22.20